2010
|
2011
|
2012
|
2013
|
2014
|
2015
|
2016
|
2017
|
2018
|
2019
|
2020
|
2021
|
2022
|
2023
|
2024
Common Arc Testing Scheduled - Enerfab Testing Scheduled - (1/16/2024)
Common Arc Testing Scheduled
Common Arc welding testing is scheduled at Local 83 for February 6-8,
2024, at 7:00 am and 11:00 am time slots (7:00 am only on the 8th).
Enerfab Testing Scheduled
Enerfab Testing is scheduled at Local 83 for March 5-7, 2024 at 7:00 a.m. Testing will be a 5G .250 wall for Thomas Hill outage. Those who do not have Common Arc certification with Enerfab will also take the standard tube test.
Call Local 83 to sign up at 816-523-8300.
Show All News Headlines